FACTORY AUTOMATION COMPETITION
COMPETITION PHASES
PHASE 2
PHASE 3
PHASE 1
Sort and Package all Product and move all Packages
Fulfill Orders by pulling Packages from the Elevated Storage Zone to finalize Shipments.
Sort and Package Product by color while removing and fixing any Defective Product.
to an Elevated Storage Zone.
Competition Phase 1 (Packing) • Show on camera and verbally describe how the Defective Product is created. • Randomize the placement of Product and Defective Product in the Beginning Inventory Storage. • Assemble the Packages in the Package Zone. • Any Defective Products must be: • Identified by the Workcell within a Production Run. • Moved to the Defect Designation/Fix Zone. • Fixed by the Student. • Placed back into the Beginning Inventory Storage. (can be done by the student) • If a Package has been filled with the correct amount of Product, any additional Product of that same color moving through the Production Run must be returned to the Beginning Inventory Storage until all Packages have been assembled and the Production Run is complete. For Phase 1 the extra Product may be manually placed back in the Beginning Inventory Storage by a student once it is safely removed from the Workcell.
8 GAME MANUAL 2024-25
Made with FlippingBook HTML5