OCP Amendment at Silverstone

Studies and Assessments

A comprehensive suite of studies was completed to evaluate site conditions, sustainability, and overall feasibility.

Environmental Study

Stormwater Management

Management

Plan & Drainage

• Active Earth Engineering Consulting completed an environmental assessment.

• Aplin Martin completed a comprehensive Stormwater Management Plan, designing a phased drainage system that meets DoS Bylaw #430 requirements. .

Slope Analysis

• CREUS Engineering Ltd. Analysis undertook the steep slope analysis, indicating areas with rock outcrops and varying slopes.

Geotechnical and Hydrogeological Studies

• MDM Groundwater Consulting Ltd. completed preliminary geotechnical and hydrogeological reviews to support safe development of the site.

Archaeological Study

• WSP Canada Inc. conducted a preliminary field reconnaissance (PFR) and record 3 archaeological potential sites (AOPs).