Regional Servicing Review
Concurrent with both Single Family Phase I and Phase II, the developer conducted community servicing analyses for:
• Sanitary Capacity Assessment – Evaluated existing system capabilities to accommodate both current and future demands
• Integrated Stormwater Management Plan (ISMP) – Prepared for the full West Sechelt drainage area, including the Sawarne lands and surrounding properties
• Geotechnical Studies – Conducted to confirm site stability and overall development suitability
• Hydrogeological Investigations – Included installation of stormwater monitoring wells to analyze surface and subsurface water conditions
Made with FlippingBook Ebook Creator