OCP Amendment at Silverstone

Regional Servicing Review

Concurrent with both Single Family Phase I and Phase II, the developer conducted community servicing analyses for:

• Sanitary Capacity Assessment – Evaluated existing system capabilities to accommodate both current and future demands

• Integrated Stormwater Management Plan (ISMP) – Prepared for the full West Sechelt drainage area, including the Sawarne lands and surrounding properties

• Geotechnical Studies – Conducted to confirm site stability and overall development suitability

• Hydrogeological Investigations – Included installation of stormwater monitoring wells to analyze surface and subsurface water conditions

Made with FlippingBook Ebook Creator