Introducing Rev1 Energy to LyondellBasell POTBA

Managing the pre-commission scope Cont..

• generate multi-discipline punch items during walkdowns and enter into CMS • takes care, custody & control of sub systems via agreed handover certificates • complete B check sheets for pre-commissioning and scan to CMS • Generate and manage all as-built drawings • walks down pre-commissioned subsystems with commissioning • handovers care, custody and control of systems to commissioning • support commissioning team with pre-commissioning personnel as required