and Nynex to build one digital head-end and distribute the service via the London Interconnect, a ‘dark fibre’ ring that Videotron had instigated to allow London operators to pass traffic to each other and allow cross franchise business links. Peter discussed this with his opposite numbers in the other operators and eventually a project group, the ‘New Horizons Project’ was set up under the loose umbrella of the CCA. Most of the New Horizons work took place in 1996 and the group produced a report to CTOs in February of 1997 aiming for a digital launch in October of that year which would have been well before the terrestrial and satellite competition. It became very clear around the report time that a lot of politicking had been going on in the background at high level within the operators and their shareholders and any decision based upon the group’s technical recommendations would be eclipsed by commercial deals. The result was a decision forced by Nynex to use their headend at Bromley to house the London digital headend and their preferred supplier of both headend equipment and digital set-top boxes. In the final analysis this proved a costly mistake and by the time the first mergers had taken place in late 1997, the Cable & Wireless group decided to start again, using Anderson Consulting to analyse the requirement, produce a system design, equipment specification requirements and oversee procurement and implementation. Telewest had already decided to go their own way, using in-house resources to design their system, but later decided to adopt the same STB specification and also use Andersons to design their headend. The net result of all this was a two year delay in launching digital cable during which time BSkyB had amassed significant new customers.

On the positive side, the two-year delay allowed for significant improvements in digital equipment performance and reduction in production costs. It was also apparent by 1999 that the Internet revolution was upon us and the carriage of two-way data on the digital networks was an essential element in the design of the network architecture. Thus it was that the new Millennium was marked by an explosion of cable modem based broadband services as the now cash-strapped MSOs tried to extract maximum revenue from existing network rather than any investment in new build. A knock on-effect of this was that Video On Demand (VOD) services, ready to launch in 2000, were also starved of capital investment and it had taken a further five years for the MSOs to recover their position and finally announce roll-out of VOD. The advent of high speed internet, whether on cable or telco networks, has revolutionised how VOD is implemented. Real-time viewing has declined and streaming, either to smart TVs, ‘phones, iPads or PCs has become the norm. The bandwidth requirements, however, pose significant issues on both backhaul/trunk and last mile technology. Many areas of the country, both rural and even existing cabled areas had limited bandwidth and the industry saw the opportunity for new investment. The last few years has seen an explosion in the number of new companies, the “Altnets”, with investors seeing a golden pot at the end of the rainbow. Whilst some of these new companies did tackle the issues of rural areas where traditional twisted pair ADSL was limited to 10MHz or less, many others decided to overbuild existing urban areas where there was already competition with BT/Openreach, Cable Operators and the like. Whether the investors dreams will come to reality remains to be seen; there have already been several mergers and liquidation.

58

75 Plus - A history of the SCTE, The Society for Broadband Professionals

75 Plus - A history of the SCTE, The Society for Broadband Professionals

59

Made with FlippingBook - Online magazine maker