Josh acted as the Civil Project Manager and Engineering Lead for this 4-storey, 37-unit residential building, which included ground-level walkouts and rear outdoor basement parking to best suit the site's grading. Surface stormwater was maximized to reduce the amount of underground storage. Josh oversaw the detailed design, servicing, and stormwater management report in support of the Site Plan approval. Downstream analysis was completed, and approvals from the City and MECP were obtained, as the existing infrastructure was near capacity with concerns of surcharging.