INTEGRATION NEWS Integration of Large Dryers – Below is a look at where we are now: o Engineering continues to incorporate the drawings into our system o Manufacturing / Facility (Granby) : o Columns for the 20T Crane (Assembly Crane) as well as contractor details for scheduling installation of footers o 10T crane (Rotor Crane) will be set in 2-3 weeks o Clearing site has begun o Facility modifications o Blades/kickers for two (2) D1050 dryer rotors lasered at EGR o End plates for two (2) D1050 rotors have arrived, with drums for rotors on schedule o Welding is scheduled, with more details to come Training o Service Technicians and Assembly Teams are scheduled for on-site training in Minnesota Sales o We have now quoted YTD $13M and received orders for $2.4M+
Fixtures for Welding Rotors have arrived at EGR