SUMMIT GONDOLA INSTALLATION Step 5:
Install all kickplates. Kickplates snap directly in from front. Pull all uprights forward to bring the kickplates to the chalkline.
Base Shoe
Kickplate
Kickplate snaps into front facing jaws of base shoe
KICKPLATES
Step 6: Leveling
Attach the nylon line to end upright as shown. Attach line at corresponding slot on opposite end upright, draw taut and secure. Examine all uprights at nylon line to determine the highest upright in run, excluding end Uprights. Pull this highest Upright forward until kickplate is on the chalkline. If run is a gondola, plumb at base shoe levelers; if run is a wall, plumb at upright and base shoe levelers. Plumb both first and last uprights using a level (provided in Installation Kit) against face of upright and adjusting the base shoe levelers only. Adjustment of the upright levelers is not needed at this time. Raise or lower end uprights until slots on ends and highest upright correspond relative to the nylon line while keeping the upright plumb. If run is a gondola, plumb at base shoe levelers, if run is a wall, plumb at upright and base shoe. Working with the remaining uprights in succession, making sure kickplates are on chalkline, then adjust for height and plumb using only base shoe levelers.
THIS CLEARANCE MUST ALLOW ANCHORS TO FIT
UPRIGHT FRONT VIEW
FLOOR ANCHOR
1 / 4 ”
MAXIMUM HEIGHT!
WARNING!
1 1 / 2 ”
10