Summit Shelving - Installation Guide Summer 2022_WEB_F_150d…

SUMMIT GONDOLA INSTALLATION

Step 7:

On gondola uprights only: Run level legs down to approximately 1/4” off the floor. THIS APPLIES TO ALL GONDOLA UPRIGHTS REGARDLESS OF ANCHORING. ONLY BASE SHOE LEVELERS ARE ANCHORED ON GONDOLAS, NOT UPRIGHT LEVELERS. Install all remaining back panels in the run.

1/4”

1/4”

ONLY ON GONDOLA UPRIGHTS! NOT ON WALL UPRIGHT LEVELERS ONLY ON GONDOLA UPRIGHTS! NOT ON WALL UPRIGHT LEVELERS

UPRIGHT CAP

Step 8:

Tabs on cap will go inside upright.

UPRIGHT CAP

Install top rail. Make sure tabs rest below first lance as shown. Install upright end covers. After metal upright covers are installed, place top cap into the top of the upright.

Tabs on cap will go inside upright.

UPRIGHT COVER

UPRIGHT COVER

Insert top corner tabs into slots in the upright

Insert top corner tabs into slots in the upright

Step 9:

To install the base end covers, simply slide them over the base shoes. They are held in place by the base shelves. VERIFY ALIGNMENT AND LEVEL OF RUN. If floor anchors are required, install them now.

CHALK LINE

BASE SHOE COVER

CHECK ALIGNMENT AND LEVEL OF RUN BEFORE ANCHORING

BASE SHELF

CHALK LINE

11

STMDISPLAYS.COM

Made with FlippingBook - Online Brochure Maker