SUMMIT GONDOLA INSTALLATION
Step 7:
On gondola uprights only: Run level legs down to approximately 1/4” off the floor. THIS APPLIES TO ALL GONDOLA UPRIGHTS REGARDLESS OF ANCHORING. ONLY BASE SHOE LEVELERS ARE ANCHORED ON GONDOLAS, NOT UPRIGHT LEVELERS. Install all remaining back panels in the run.
1/4”
1/4”
ONLY ON GONDOLA UPRIGHTS! NOT ON WALL UPRIGHT LEVELERS ONLY ON GONDOLA UPRIGHTS! NOT ON WALL UPRIGHT LEVELERS
UPRIGHT CAP
Step 8:
Tabs on cap will go inside upright.
UPRIGHT CAP
Install top rail. Make sure tabs rest below first lance as shown. Install upright end covers. After metal upright covers are installed, place top cap into the top of the upright.
Tabs on cap will go inside upright.
UPRIGHT COVER
UPRIGHT COVER
Insert top corner tabs into slots in the upright
Insert top corner tabs into slots in the upright
Step 9:
To install the base end covers, simply slide them over the base shoes. They are held in place by the base shelves. VERIFY ALIGNMENT AND LEVEL OF RUN. If floor anchors are required, install them now.
CHALK LINE
BASE SHOE COVER
CHECK ALIGNMENT AND LEVEL OF RUN BEFORE ANCHORING
BASE SHELF
CHALK LINE
11
STMDISPLAYS.COM
Made with FlippingBook - Online Brochure Maker