DISPLAY SHELVING INSTALLATION INSTRUCTIONS Parts Identification
TOP RAIL
UPPER BACK (EXTENSION)
UPRIGHT CAP
UPRIGHT END COVER
CENTRE RAIL
(ONLY INCLUDED WHEN STACKING TWO OR MORE PEGBOARD SHEETS)
SPLICER
BASIC UPRIGHT
UPPER SHELF
CENTRE RAIL
LOWER BACK
LOWER RAIL
BASE SHELF
Tools Required: • Chalk Line • Mallet and Hammer • Screwdriver • Leveling Wrench (Included) • Magnetic Level (Included) • String or Dry Line
KICKPLATE
BASE SHOE
BASE SHOE COVER
2
STMDISPLAYS.COM
Made with FlippingBook - Online Brochure Maker