SUMMIT GONDOLA INSTALLATION
Measure and lay down your Summit Gondola Shelving System in your retail space according to your fixture plan. Mark the floor for run locations utilizing a starting point and one for the edge of each shelving. Snap chalk lines on the floor to ensure the shelving is built at the correct locations. BEFORE YOU BEGIN: 1 Please check all packing materials for contents before discarding any boxes or fillers. 2 Inspect all components for physical damage prior to installation. 3 Report any damaged or missing parts immediately. 4 Two people will be needed for this assembly. 5 Assemble the display in the area it will occupy. Step 1:
Kick Plate Base Shoes
Top Rails
Base Shoes Uprights Chalk Line
Bottom Rails Kick Plate Center Rails
Step 2:
Attach base shoes on each side of the uprights. Engage the spring-loaded latch by pushing it into the slot of the Upright. Latch will “click” when fully engaged. Latch MUST be fully engaged with upright. (Note: Shelving system might collapse if the base shoes are not installed properly)
BASE SHOE LOCKED Shoe will "CLICK" when locked. Spring lock must rest against embossment and latch must go through slot on upright.
BASE SHOE UNLOCKED
8
STMDISPLAYS.COM
Made with FlippingBook - Online Brochure Maker