2. Minimum Front Setback . 20 feet.
3. Minimum Rear Yard Setback . 8 feet.
4. Zero Lot Line Side Yard Setback . 0 to 18 inches (“zero lot line side”).
5. Minimum Side Yard Setback . 16 feet.
6. Corner Side Yard Setback . Where the series of zero lot lines ends at a corner lot, the residential dwelling shall be setback a minimum of 10 feet from the corner side property line. This may require the corner lot to have a wider lot width to accommodate this setback standard. This standard shall only apply to corner lots.
ii. Distance between Principal Buildings. The minimum distance between principal buildings in a zero lot line development shall be 16 feet measured from building wall to building wall.
iii. Maintenance Easement . The following standards shall apply for maintenance along the zero lot line side:
1. Minimum Easement Size . A minimum five (5) feet maintenance easement shall be provided on the adjacent lot to and along the length of each “zero - line side”. No projections from the residential dwelling shall be permitted to extend beyond the “zero - line side”. 2. Covenant Includes Maintenance Easement . By means of a “Declaration of Covenants” the adjacent property owner shall permit the adjacent owner to access and utilize the maintenance easement to maintain the side of the residential dwelling that is the “zero lot - line side”. iv. Homeowners’ Association. The developer of a zero lot line development shall establish a homeowners’ association as part of the declaration of covenants to maintain any open space, entrance ways, signs, common area or other facilities or features of the zero lot line development. A draft of the declaration of covenants shall be submitted to the Town for review prior to recording the instrument with the Wake County Register of Deeds.
v. Site Specific Building Footprint. A preliminary subdivision plan shall include the configuration, location and footprint of the residential dwelling units on
Made with FlippingBook interactive PDF creator