Land Development Ordinance - Amended 11-19-2024

A. Access . Access for manufacturing, processing and storage use shall be from a Type 8 or greater street only. Acceptable access shall not include local or residential streets.

(2)

Batching Plant, Asphalt & Concrete .

A. Minimum Lot Size . The minimum zoning lot size for a batching plant facility is five (5) acres.

B. Maximum Height . Any production-related silos shall not exceed a height of 85 feet and shall be a neutral color and located on the same property as the batching plant. The silo shall have a fall zone that is equal to or greater than the height of the silo. All other buildings and structures shall meet the maximum height requirement of the Land Development Ordinance. C. Outdoor Storage . Outdoor products and materials storage shall not be located within any setback required and shall be screened from a public right-of-way or adjacent residential district. D. Setbacks . All operations and facilities associated with the batching plant facility shall maintain a setback of 100 feet to any property line and 150 feet adjacent to a residential district, except where the zoning lot line is adjacent to a railroad right-of-way, in which case the underlying Heavy Industrial Zoning District setback shall apply to such zoning lot line.

E. A Special Use Permit is required for operation in the Heavy Industrial (HI) Zoning District.

(3)

Brewery & Distillery .

A. Accessory Uses Permitted . Accessory uses are permitted for a brewery/distillery and may include the retail sale of their products and merchandise, tasting room, tavern, restaurant (subject to Wake County ABC regulations and permitting) or other related accessory uses, in accordance with the following standards:

i. Location . These accessory uses shall be permitted only if they are located on the premises of the facility and where no amplified music or sound is permitted outside of the primary structure.

Made with FlippingBook interactive PDF creator