authorized agent to see that the building does not encroach upon such street, alley, or other public place.
D. Call for Inspection . All holders of permits, or authorized agent(s), shall notify the Inspections Department when work is ready for inspection and to provide access to and means for inspection of the work for any required inspections so that approval may be granted before work is continued. i. Footing Inspection. Footing inspections shall be made after the trenches are excavated, all grade stakes are installed, all reinforcing steel and supports are in place and appropriately tied, all necessary forms are in place and braced, and prior to placement of any concrete.
ii. Under Slab Inspection. Under slab inspections, as appropriate, shall be made after all materials and equipment to be concealed by the concrete slab are completed.
iii. Foundation & Crawl Space Inspection. Foundation and crawl space inspections shall be made after all foundation supports are installed. This inspection is to check foundation supports, crawl space leveling, ground clearances and positive drainage, when required. iv. Rough-In Inspection. Rough-in inspections shall be made when all building framing and parts of the electrical, plumbing, fire protection, or heating- ventilation and/or cooling system that will be hidden from view in the finished building have been placed, but before any wall or ceiling finish or building insulation is installed. v. Building Framing Inspection. Building framing inspections shall be made after the roof, excluding roof covering, wall ceiling and floor framing is complete, with appropriate blocking, bracing and fire-stopping in place. The following items shall be in place and visible for inspection:
1. Pipes
2. Chimney and vents
3. Flashing for roofs, chimneys and wall openings
4. Insulation baffles