Land Development Ordinance - Amended 11-19-2024

E. Unprocessed Material . On-site storage of unprocessed materials shall be limited to 45 days and the pile height of storage material shall not exceed 15 feet.

F. Landscape Requirement . Storage areas shall be screened to ensure that storage areas cannot be seen from a public right-of-way or adjacent residential zoning. The required screening shall be in conformance with the standards of Article O Landscaping & Tree Protection Standards.

G. A Special Use Permit is required for operation in the Heavy Industrial (HI) Zoning District.

(10) Woodworking, Cabinet Making, & Countertop Manufacturing . This type of manufacturing use shall be conducted within an enclosed structure including storage of all materials and equipment and finished products within the same enclosed structure as the use. The access requirement shall not apply.

(11) Mining, Quarrying & Processing.

A. Minimum Setback. All operations and facilities associated with a mining, quarrying and processing use shall maintain a minimum setback of 300 feet to any property line including any public right-of-way.

B. Reclamation Plan. The applicant shall prepare a reclamation plan for when the operation ceases to exist to be included as part of the Special Use Permit.

C. A Special Use Permit is required for operation in the Heavy Industrial (HI) Zoning District.

o. Medical Offices & Facilities

(1)

Ambulatory Healthcare with Emergency Facility .

A. Minimum Lot Size . The minimum zoning lot size is two (2) acres.

B. Minimum Setback . The principal facility shall have a minimum setback of 30 feet from all property lines and public right-of-way.

(2)

Hospital, Medical Center .

Made with FlippingBook interactive PDF creator