5. All lintels required to be bolted to the framing for support. Such lintels shall not be covered by any exterior or interior wall or ceiling finish material prior to approval. Work may continue without approval of lintels supported on masonry or concrete. vi. Insulation Inspection. Insulation inspections shall be made after approved rough-in and building framing inspections, and after the permanent roof covering is installed and all insulation and vapor retarders in place, but prior to any wall or ceiling covering being applied. vii. Fire Protection Inspection. Fire protection inspections shall be made in all buildings where any material is used for fire protection purposes. The permit holder, or authorized agent(s), shall notify the Inspections Department after all fire protection materials are in place. Such fire protection materials shall not be concealed until inspected and approved by the Inspections Department and the Fire Inspector/Marshall.

viii. Final Inspection. Final inspections shall be made for each trade after completion of the work authorized under the technical codes.

E. Construction Approval Required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the Code Enforcement Official. The Inspections Department, upon notification, shall make the requested inspection(s) and shall either indicate the portion of construction being inspected is satisfactory as completed or shall notify the permit holder, or authorized agent(s) that the work fails to comply with the technical codes. Failure to Request for inspections or proceeding construction without approval at each state of construction shall be deemed a violation of this Article. F. Certificate of Compliance. Upon satisfactory completion of building, plumbing, mechanical, electrical, fire protection and/or gas system inspections, or portions thereof, a certificate of compliance shall be issued. The certificate of compliance represents that the structure or system is complete and, for certain types of permits, is permission granted for connection to a utility system. The certificate of compliance shall not be construed to grant authority to occupy a building. G. Certificate of Occupancy (CO). No new building or part thereof shall be occupied, and no addition or enlargement of any existing building after being altered or moved shall be occupied, and no change of occupancy shall be made in any existing building or part

Made with FlippingBook interactive PDF creator