Land Development Ordinance - Amended 9-2-2025

z. Utilities

(1)

Incinerator .

A. Lot Size . The minimum zoning lot size for an incinerator is five (5) acres. If an incinerator is in conjunction with a sanitary landfill, the sanitary landfill must equal or exceed five (5) acres.

B. Minimum Setback . The incinerator facility shall be setback a minimum of 300 feet from any property line.

C. Site Plan . A site plan is required in accordance with Article Q Procedures & Administration and shall be submitted for review and approval by the Town.

D. A Special Use Permit is required for operation in the Heavy Industrial (HI) Zoning District.

(2)

Utility Buildings & Use .

A. General Standards. Such building or use shall not create excessive noise, odor, smoke, dust, or possess any objectionable characteristics, and shall be compatible with the surrounding development including but not limited to material, structure design, color, height or visibility. B. Utility Buildings & Use, Private. A Special Use Permit is required for operation in the Residential Agricultural (RA), Residential Low Density (RLD), Residential Medium Density (RMD), Residential High Density (RHD), Town Center Residential (TCR), Downtown Center-1 (DC-1), and Downtown Center-2 (DC-2) Zoning Districts. C. Utility Buildings & Use, Public. Public utility buildings & uses proposed by the Town of Fuquay-Varina shall be allowed in all zoning districts. Public utilities & uses maintained by any other unit of local government shall be allowed only in the nonresidential zoning districts.

(3)

Recycling Plant .

A. Minimum Lot Size . The minimum zoning lot size for a recycling plant shall be five (5) acres.

Made with FlippingBook interactive PDF creator