Land Development Ordinance - Amended 11-19-2024

(7) Obtain Actual Elevation of Waterproofed Structures & Utilities . Obtain actual elevation (in relation to NAVD 1988) to which all new or substantially improved structures and utilities have been floodproofed, in accordance with §9-1401 Flood Damage Prevention Regulations, h. Floodplain Development Application; Permit Procedures & Certification Requirements, (3) Certification Requirements. (8) Obtain Actual Elevation of All Public Utilities. Obtain actual elevation (in relation to NAVD 1988) of all public utilities in accordance with §9-1401 Flood Damage Prevention Regulations, h. Floodplain Development Application; Permit Procedures & Certification Requirements, (3) Certification Requirements. (9) Obtain Certifications . When flood proofing is utilized for a particular structure, obtain certifications from a registered professional engineer or architect in accordance with §9- 1401 Flood Damage Prevention Regulations, h. Floodplain Development Application; Permit Procedures & Certification Requirements, (3) and §9-1401 Flood Damage Prevention Regulations, k. Revisions for Flood Hazard Reduction, (2) Specific Standards, B Nonresidential Construction. (10) Render Necessary Interpretation . Where interpretation is needed as to the exact location of boundaries of the Special Flood Hazard Areas and Future Conditions Flood Hazard Areas, make the necessary interpretation (for example, where there appears to be a conflict between a map boundary and actual field conditions). The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in §9-1401 Flood Damage Prevention Regulations, j. Variance Procedures. (11) Base Flood Elevation (BFE) Data not provided . When Base Flood Elevation (BFE) data has not been provided in accordance with §9-1401 Flood Damage Prevention Regulations, f. General Provisions, (2), obtain, review and reasonably utilize any floodway data or non- encroachment area data available from a Federal, State or other source, including data developed pursuant to §9-1401 Flood Damage Prevention Regulations, k. Provisions for Flood Hazard Reduction in order to administer the provisions of the Flood Damage Prevention Regulations. (12) Letter of Map Amendment (LOMA) . When the lowest ground elevation of a land parcel or structure is in Special Flood Hazard Area and Future Conditions Flood Hazard Areas is above the Base Flood Elevation (BFE), advise the property owner(s) of the option to apply for a Letter of Map Amendment (LOMA) from the Federal Emergency Management Agency (FEMA). Maintain a copy of the Letter of Map Amendment (LOMA) issued by FEMA in the floodplain development permit file.

Made with FlippingBook interactive PDF creator