which the SCM was designed.
B. Annual Maintenance, Inspection & Report . The following maintenance inspections and reports are required:
i. Inspection Report . The person responsible for maintenance of any SCM installed pursuant to this section shall submit to the Stormwater Administrator an inspection report from a qualified registered North Carolina professional engineer, surveyor, or landscape architect service only in their area of competence. The inspection report shall contain all of the following:
1. The name and address of the landowner.
2. The recorded book and page number of the lot of each SCM.
3. A statement that an inspection was made of all SCMs.
4. The date the inspection was made.
5. SCM Performance . A statement that all inspected SCMs are performing properly and are in compliance with the terms and conditions of the approved maintenance agreement required by this section.
6. The original signature and seal of the engineer, surveyor or landscape architect.
ii. Stormwater Administrator Forms . All inspection reports shall be on forms supplied by the Stormwater Administrator. An original inspection report shall be provided to the Stormwater Administrator beginning one (1) year from the date of as-built certification and each year thereafter on or before the date of the as-built certification.
(2) Operation & Maintenance of Engineered Stormwater Control Measures (SCMs).
A. General . The following standards and responsibilities shall apply to all operation and maintenance agreements:
i. Homeowners’ Association Established . For subdivisions, the Town requires that a homeowners ’ association (HOA) be formed if only for the purpose of completing the construction, maintenance, and inspection responsibilities as set
Made with FlippingBook interactive PDF creator