§9-1468 RECORDING OF FINAL PLAT
a. Approval of Subdivision Plat by Town
No final plat of any subdivision permitted by the Subdivision Regulations shall be entitled to record a plat with the Wake County Register of Deeds until such plat has been approved in the manner prescribed under the Subdivision Regulations and according to Article Q Procedures and Administration, of the Land Development Ordinance, and has met the following standards: (1) Preliminary Major Subdivision Plat Submittal . A preliminary major subdivision plat shall be submitted for review and approved by the Town Board of Commissioners, except under the provisions of the Subdivision Regulations for a minor subdivision.
(2) Construction Drawing Submittal . Construction drawings for the subdivision or phase(s) of the subdivision shall be submitted for review and approval by Town staff.
(3) Infrastructure Improvements Installation . All infrastructure improvements (streets, curb and gutter, sidewalks/greenways, water and wastewater (sewer), storm drainage and stormwater management, streetlighting, and other applicable requirements as prescribed in the Land Development Ordinance have been designed to Town standards, installed, inspected and approved by the Town of Fuquay-Varina. (4) Review of Documents . All documents (covenants, homeowners’ association declarations, warranties, and development agreements if applicable) have been reviewed and approved by the Town of Fuquay-Varina.
b. Recordation of Final Plat
(1) Recordation within 25 Days . A final subdivision plat map(s) shall be recorded at the Wake County Register of Deeds office within 25 days of the date the Review Officer signs such final plat map(s). If the required copies of the recorded final plat map(s) have not been submitted within the designated 25 days, the Town of Fuquay-Varina will not review or issue a building permit until the Town has received the appropriate copies of the recorded final subdivision plat map(s). (2) Failure to Submit Plat Map(s) Upon Town Engineer's Approval . Once the infrastructure has been completed and approved by the Director of Engineering, the final subdivision plat map(s) must be submitted for execution of signatures by the Town within 120 days of such approval of the final subdivision plat map(s). Failure to meet this deadline the Town may require the property owner/developer to request a new field inspection of the infrastructure
Made with FlippingBook interactive PDF creator