adjacent to an existing or proposed street in accordance with the Town’s Com prehensive Transportation Plan, and the Town’s Standard Specifications & Construction Details. If the street is maintained by the North Carolina Department of Transportation (NCDOT), then such improvements shall follow NCDOT standards in addition to the Town’s adopted plans and standards. b. On-Site Street & Utility Improvements . All on-site street and utility improvements (water, wastewater (sewer) and storm drainage) shall be installed in accordance with the Town’s Standard Specifications & Construction Details, and the Town’s adopted plans, either by constructing improvements, or by reservation of right-of- way based on specific streets where identified as such in this Article and the Comprehensive Transportation Plan. c. Infrastructure Improvements & Guarantees . All improvements shall be installed according to the Town’s Standard Specifications & the Construction Details or as otherwise provided in this Article. A Guarantee may be submitted for consideration in accordance with Article J Subdivision Regulations, §9-1466 Guarantees.
§9-1608 STREETS NOT REQUIRING IMPROVEMENTS
The Town of Fuquay-Varina has identified certain conditions where standard street improvements may not be required, except as provided by the Land Development Ordinance, where the North Carolina Department of Transportation (NCDOT) requires improvements according to their standards, or required improvements are necessary based on a traffic impact analysis (TIA) required by the Town. Additional right-of-way may be required as necessary, and streetlights, sidewalks, greenways or side paths shall be required in accordance with the adopted Comprehensive Transportation Plan and Fuquay-Varina Pedestrian Plan, which shall include striped crossings at designated locations and at all streets with a right-of-way of 60 feet or greater. The following streets are exempt from standard street improvements but shall be required to provide dedication of right-of-way and/or improvements as indicated:
a. US 401 (N Main Street / Fayetteville Road): Right-of-way dedication only from NC 42 Hwy / S NC 55 Hwy to Ten-Ten Road (SR 1010).
b. NC 55 Hwy (N Broad Street): Right-of-way dedication only from Wade Nash Road / Dickens Road to urban service area boundary.
c. Fuquay-Varina Parkway: Right-of-way dedication and construction of outer two (2) lanes with outside curb and gutter, pedestrian improvements and grassed median (depressed) and necessary drainage.