Land Development Ordinance - Amended 11-19-2024

(2) Nonresidential Development . Connection shall be made to public wastewater where located within 50 feet per 350 gallons of water demand or wastewater generation, provided that the maximum required connection distance is 2,500 feet, as measured along the probable route of the service line. (3) Development Agreement. A development agreement may be considered, subject to both the Town Board and the property owner(s)/developer(s) agreeing to terms on specific improvements and the return on investment received by the Town through future tax revenues, in compliance with Article Q Procedures & Administration.

c. Construction to Town Specifications

All utility lines, connections and improvements related to such utilities shall be installed in accordance with the Town’s Standard Specifications & Construction Details.

d. Reimbursement for Oversizing Public Utility Lines

Reimbursements for oversizing public utility lines may be permitted and shall be subject to the conditions and standards set forth in Part 5, Chapter 3 of the Town Code of Ordinances of the Town of Fuquay-Varina. A development agreement may be required, as provided by the Land Development Ordinance.

e. Well Permitting Requirements

Drinking water wells may be permitted within the Town of Fuquay-Varina under the following circumstances:

(1) If the property is undeveloped or unimproved, the Town shall allow a single well permit on the property, as issued by Wake County, regardless of the proximity to the Town’s public water lines. (2) If the property is developed or improved, the Town shall allow a single well permit on the property, as issued by Wake County, only if the Town has not yet installed water lines directly available to the property; or if the Town cannot provide water service to the property at the time the request is made.

§9-1616 STREET NAMES & ADDRESSES

a. Street Names

Made with FlippingBook interactive PDF creator