are two (2) forms of driveway permits; a driveway permit for access to a North Carolina Department of Transportation (NCDOT) maintained street, and a driveway permit for access to a Town maintained street. (1) Department of Transportation Driveway Permit . A driveway permit for access onto a North Carolina Department of Transportation (NCDOT) maintained street will require approval from NCDOT District 1 in accordance with the following procedures: A. Submission of Application to Town’s Director of Engineering . Upon completing the application for a driveway permit, the applicant shall submit the completed driveway permit application to the Director of Engineering for review. B. Director of Engineering Review . The Director of Engineering shall review the driveway permit application by taking into consideration existing driveways, the classification of the street, traffic volume and NCDOT standards. Based on the proposed development, a traffic impact analysis (TIA) may be required in accordance with NCDOT standards and/or Town’s Standard Specifications & Construction Details. C. Director of Engineering Approval . Once the Director of Engineering has determined the requested driveway permit application is complete and satisfies NCDOT and Town of Fuquay-Varina standards where applicable, the Director of Engineering shall sign the driveway permit application and notify the applicant to submit the driveway permit application to NCDOT. NCDOT will not accept an application for a driveway permit without the signature of the Town’s Director of Engineering.
(2) Town Driveway Permit . A driveway permit for access to a Town maintained street shall be approved by the Town’s Director of Engineering.
A. Standards for Submittal. A driveway permit shall be required for the installation of any driveway, including secondary driveways. An approved major subdivision or site plan shall serve as the driveway permit for lots on Town streets proposed as part of such development.
B. Submit Application to Director of Engineering . The applicant shall submit the completed driveway permit application to the Director of Engineering for review.
Made with FlippingBook interactive PDF creator