C. Director of Engineering Review . The Director of Engineering shall review the driveway permit application, taking into consideration existing driveways, the classification of the street, traffic volume and Town standards. Based on the proposed development, a traffic impact analysis (TIA) may be required in accordance with the Town’s Standard Specifications & Construction Details. D. Approval . Once the Director of Engineering has determined the requested driveway permit application is complete and satisfies the Town of Fuquay- Varina standards, the Director of Engineering shall sign the driveway permit and notify the applicant of the approval. Such approval requires the applicant to install and construct the driveway in accordance with the approved driveway permit application.
l.
Fence Installation
The Town of Fuquay-Varina has developed standards for the placement, material and height of a fence for residential and nonresidential uses. Although applicable fence standards are outlined in Article G Lot & Structure Provisions, fence permits are not required.
m. Final Subdivision Plat
A final subdivision plat is reviewed by the Planning Department, specifically by the Review Officer, to determine that all final subdivision plats are in conformance with North Carolina General Statutes §47-30 before being submitted to the Wake County Register of the Deeds for recording. Final subdivision plats include but are not limited to: a major subdivision final plat, minor subdivision plat, recombination plat, exempt plat, and map of correction plat. No final subdivision plat within the jurisdiction of the Town of Fuquay-Varina shall be accepted for recording by the Wake County Register of Deeds until approval has been granted by the Town of Fuquay-Varina in accordance with the Land Development Ordinance. (1) Major Subdivision Final Plat . Upon approval of a preliminary major subdivision plat, approval of construction drawings, the construction and installation of all infrastructure according to the approved construction drawings, and all inspections for compliance have been completed, the following procedure shall apply to obtain signatures from the Town to record the final plat:
A. Inspections . All improvements shall be inspected by the Director of Engineering, Public Utilities Department and the Public Works Department.
Made with FlippingBook interactive PDF creator