The developer shall contact the Public Works Department to schedule a walk- through of all improvements. The contractor(s) who installed the infrastructure shall be a part of the scheduled walk-through. A punch list will be created and given to the developer or contractor to correct any deficiencies as required. The developer/contractor shall request a second inspection after all the deficiencies have been corrected. No further action on the requested final subdivision plat shall be taken until all inspections and corrections have been approved by the Director of Engineering. B. Review Copies . The developer shall instruct a surveyor to prepare the final subdivision plat and application and submit the minimum number of copies required by the Planning Department for distribution and review by Town Staff. The copies shall reflect the proposed final subdivision plat to be recorded and shall be in conformance with the approved preliminary major subdivision plat, or amendments, approved construction drawings and required certifications in accordance with Appendix E Certifications. C. Staff Review . The Review Officer shall review the final major subdivision plat. Comments will be provided to the surveyor and/or developer regarding corrections and/or additions to the final major subdivision plat and a check list of items that need to be completed prior to submitting the final major subdivision plat mylars. In order to record a final plat through the Town of Fuquay-Varina, the following items must be completed prior to the Town signing the final plats:
i. Infrastructure Completed . All infrastructures have been installed in accordance with the Town’s Standard Specifications & Construction Details and the approved construction drawings.
ii. Inspections . A walk-through inspection shall be scheduled with the Public Works Department and Public Utilities Department to determine that all items are installed and constructed to Town standards, and to determine that all conditions are acceptable to the Town. Any deficiencies shall be marked by the Town and a punch list provided to the property owner/developer. The property owner/developer shall make such corrections and call for a follow-up inspection. iii. Recreation Fees . All recreation fees, as required, shall be due to the Town at the time of submitting the final plat, except that may otherwise be permitted in accordance with the Land Development Ordinance or
Made with FlippingBook interactive PDF creator