Land Development Ordinance - Amended 9-2-2025

2. Existing streets and rights-of-way

3. Existing utility infrastructure, including water and sewer lines, public utility easements, transmission lines, existing storm drainage

4. Existing structures on the property

5. Locations, species, and sizes of existing heritage trees in compliance with Article Q Procedures & Administration, §9-1406 Clear-Cutting & Protection of Heritage Trees Regulations 6. Existing environmental features including wetlands, riparian buffers, Wake County flood hazard soils, FEMA floodplain and existing vegetation conditions shall be provided in compliance with Article I Environmental Protection

v. Contours . Contours for the preliminary major subdivision plat shall be at intervals of not more than five (5) feet.

vi. Lot Layout . Proposed lot lines identifying each lot with a unique lot number, the minimum building setback lines on each lot, the square footage and acres of each lot.

vii. Phasing . Identify the proposed phases for the preliminary major subdivision plat. If the property owner/developer requests to adjust or reconfigure the phase lines from the original approved preliminary plat, or add new phases to an approved preliminary plat, such request shall be approved by the Planning Department as an administrative amendment.

viii. Streets. Proposed streets, including street names approved by Wake County, proposed right-of-way, and road cross-sections in accordance with the Town’s Standard Specifications & Construction Details.

ix. Utilities . Proposed and existing utilities providing location, size, and connections to existing systems. Proposed public water and sewer shall

extend to property lines as determined by the Public Utilities Department to serve adjacent property and/or drainage basins.

Made with FlippingBook interactive PDF creator