v. State Certifications & Approvals . The property owner/developer shall be responsible for submitting water and wastewater permits to the State of North Carolina, Division of Water Resources. No construction for water and wastewater utilities are permitted until the property owner/developer receives an authorization to construct from the State and a copy of such authorization is submitted to the Public Utilities Director. G. Landscaping Sheet/Plan . Identify the location of existing vegetation to be protected and proposed landscaping for the site development, in accordance with Article O Landscaping & Tree Protection Standards, including a landscaping plan with a typical 100 feet section of plant material proposed, if required. The plant material proposed shall be identified by giving the type of vegetation (evergreen or deciduous), species, size, height and quantity at installation, the size and height at maturity and the spacing between plant materials.
H. Construction Detail Sheet. Details of all constructed or installed products or features, as required by the Town’s Standard Specifications & Construction Details, shall be included.
I. Stormwater Management . The site plan shall identify stormwater management facilities on site, in accordance with Article I Environmental Protection Standards, §9-1405 Stormwater Management Regulations. Such information shall be included on the landscaping sheet/plan and on other sheets as applicable. J. Storm Drainage . Storm drainage shall be included on the utility plan sheet and any other sheets where applicable, and shall include all existing and proposed storm drainage facilities including but not limited to pipe locations, junction boxes, catch basins, manholes, drainage ways with easements, and identify the type material, size, inverts, flumes, dissipation pads and level spreaders as required in accordance with Article M Thoroughfares, Drainage & Utility Standards and as follows:
i. Certification . A copy of the Registered Engineer’s calculations and certification of the stormwater drainage facility design.
ii. Encroachment . Storm water improvements within an existing public right-of-way shall require an encroachment agreement from the North
Made with FlippingBook interactive PDF creator