by way of example but not limited to, mechanical, electrical, plumbing, painting, roofing, tile, doors and windows, cabinets, carpentry, masonry, flooring, siding, glass sales and repairs, landscaping, and irrigation.

(67) SPECIAL USE PERMIT. The term defining a special use permit (formerly known as “special exception”) is a permit that would not be appropriate, generally, as a use by right, without restrictions throughout a zoning district but which, if controlled as to number, area, location, or, relation to the neighborhood, would promote the public health, safety, general welfare, morals, order, comfort, convenience, appearance, or prosperity. Such a use could be permitted in a zoning district as a special use permit, if specific provisions are made for it and follows the regulatory procedures and approval by the Board of Adjustment. (68) SQUARE (Form Based). The term defining a type of civic space designed for unstructured recreation and civic purposes, spatially defined by building frontages with formal paths, lawns, and trees. (69) STABLE. A use that permits the care, feeding and housing of horses overnight and long term, horse breeding, training, recreational use and riding school of four (4) or more horses for a fee. (70) STADIUM/ARENA. An open or partially enclosed facility or building used for the gathering of people as an audience for outdoor or semi-events with tiers of seats for spectators primarily used for the viewing of athletic events, major sporting events, concerts, celebrations, lectures, plays, presentations and similar entertainment events.

(71) STAND (Clear Cutting/Tree Protection). The term defining a group of trees, occupying a specific area that is fairly uniform in species, composition, age and condition.

(72) START OF CONSTRUCTION (Flood Damage Prevention). The term defining and including substantial improvement and shall mean the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of a structure (including a manufactured home) on a site, such as the pouring of slabs or footings, installation of piers, construction of columns, or any work beyond the stage of excavation or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations, or the erection of temporary forms; nor does it include the installation on the

Made with FlippingBook interactive PDF creator