and EMU Standards. For uses developed through Site Plan approval where multiple principal buildings are allowed on one parcel, all principal buildings must be located within the maximum building setbacks, contributing to the minimum percentage façade buildout at setback or between the secondary frontage minimum and maximum setbacks. d. Rear setbacks for accessory structures shall be a minimum of three (3) feet measured from the property line. In the absence of rear alley or rear lane, the rear setback shall be as shown in said tables. e. Setbacks for principal buildings (i.e. buildings that contain principal uses) shall be as shown in said tables. Setbacks may be adjusted by up to 10% by an administrative adjustment to accommodate for specific site conditions. The applicant must provide written request, including reasoning for each of the findings required for administrative adjustment approval of Article Q Procedures & Administration of the Land Development Ordinance.
f. Alternatives to the required percent façade buildout at maximum setback (where applicable) are as follows:
(1) Landscaping seat walls may count towards up to 25% of the required façade buildout requirement with the following standards:
A. Walls shall meet frontage fence requirements for the applicable district with the following exceptions/limitations:
i. Walls shall incorporate seating areas that shall be a minimum of 18” in height.
ii. Wall columns/piers shall be a maximum of 60” in height.
iii. Walls shall be constructed of masonry, stone, and/or decorative metal.
Figure – Landscaping Seat Walls
Made with FlippingBook interactive PDF creator