Land Development Ordinance - Amended 11-19-2024

_____________________________ Owner

Where a subdivision plat or site plan includes crossing a Federal Emergency Management Agency (FEMA) flood zone, a registered engineer shall certify that there will be no impact to the 100 year flood way elevations and floodway width: Engineering “No Rise” Certification : This is to certify that I am a duly qualified engineer licensed to practice in the State of North Carolina. I further certify that I have prepared the technical data to support the fact that the proposed _____________________________ (Development) will not create a rise to impact the 100 year flood elevation, floodway elevation and floodway widths on _____________________________ (Identified stream) at the published sections to the Flood Insurance Rate Study for the Town of Fuquay-Varina dated ________________________________, and will not impact the 100 year flood elevation, floodway elevation and floodway widths at published cross-sections in the vicinity of the proposed development. _______________________________ (SEAL) Engineer’s Signature ______________________________ Title ______________________________ Address This _______ day of ______________, 20___.

Made with FlippingBook interactive PDF creator