ESRT High Performance Design and Construction Guidelines

n) Verify the lighting control system has been connected to the BMS and that the occupancy status is being used to control HVAC setback o) The manufacturer shall commission the Ionization system to ensure it is installed and functioning correctly and that the correct level of output has been set. Measurements shall be taken of the air quality to verify its operation.

Made with FlippingBook - Online Brochure Maker