GWO ARTR v2.1

ADVANCED RESCUE REFRESHER TRAINING STANDARD V02.1 ART-NR

2020-10-01_TSR_ARTR_V02.1

f. Temperature/Working conditions (dehydration, heat stroke, exhaustion) g. Injured person suspension trauma (repetition from GWO WAH put into an advanced rescue context) h. Slips and trips Explain how to assess and determine evacuation strategy (relevant rescue method, route technique, certified equipment, and required personnel) for a rescue scenario in a WTG Demonstrate how to prepare the injured person for safe transportation (i.e., apply rescue head support, fit harness and other PPE, and package him on a rescue stretcher or transfer board) Demonstrate how to manually transport an injured person on a rescue stretcher or transfer board - in a balanced way - or by means of a zip line (areal ropeway) when relevant Demonstrate how to attach the rescue device to the injured person in a safe and proper manner Demonstrate how to utilize tagline(s) during one exercise, when performing outside evacuation Demonstrate how to balance an injured person from a horizontal to a vertical position (and vice versa), in order to move the injured person downwards through hatches, or similar Demonstrate how to select and utilize Certified and structural anchor points Demonstrate how to apply the theory of Lifting angle, angle factor, deviation and edge protection Demonstrate how to rig and operate the lowering/raising rescue system in a proper manner aiming to achieve a safe and efficient rigging setup, including the utilization of an injured person personal fall protection equipment backup system Demonstrate how to apply rescue methods, techniques and clear and precise communication in performing safe ascending/descending rescue operations from a WTG Demonstrate how to perform regular checks of the injured person during the entire rescue operation Demonstrate how to perform the rescue effort as a team member or team coordinator Demonstrate how to perform an evacuation (dummy), with the rescue device in a passive setup for evacuation outside of the tower, from the WTG nacelle to a primary assembly area (ground or transition piece) Demonstrate how to perform an evacuation (dummy), with the rescue device in an active setup for evacuation inside the tower, from the WTG nacelle to a primary assembly area (ground or transition piece), carrying the rope bag with him Demonstrate how to perform an evacuation (dummy) from a transition piece to a secondary assembly area (vessel), by transitioning the rescue device setup configuration from an active setup (descent inside tower to transition piece) to a passive setup for descent from the transition piece to the vessel, by:

GLOBAL WIND ORGANISATION www.globalwindsafety.org

47 / 84

Made with FlippingBook flipbook maker