FINAL East Sunrise Improvements Master Plan_3.21.19

C. GATEWAY ENTRANCES These streets serve as entry ways into the Village Center from Oakland Park Boulevard. They include a median with large palms and are mostly fronted by single-family residential. On NW 68th Avenue, there is a brick-like structure with columns serving as a physical gateway into the neighborhood. There are many opportunities throughout the area to continue a similar theme of other brick-like architectural features that build upon the character of east Sunrise and serve as amenities to pedestrians and bicyclists. These streets have limited traffic calming features, little wayfinding signage, and inconsistent lighting.

R.O.W

STREET SECTION

NW 68 TH AVENUE BETWEEN SUNSET STRIP & OAKLAND PARK BOULEVARD

Description

01 02 03 04 05

4’ sidewalk

2 lanes in each direction

9’-6” median

No curb and gutter at sidewalk. Only curb at median.

Major arterial street lighting (both sides)

Short-Term Improvements

01 02 03

Maintain lane widths

Designate “sharrow” along travel lanes (shared lane marking) Provide traffic calming measures, such as, striped intersections, painted crosswalks, raised speed table, and bollards. (pedestrian safety) Increase tree canopy along sidewalk (pedestrian comfort; shade) Provide additional landscape at median (street aesthetics)

PLAN

LEGEND

04 05

AL

C D

G/T

PL TG

SF VV

Asphalt Removal & Landscape

Curb and GuƩer

Strip of Grass/ Shade Tree

Planters

Single-Family Home Vehicular Verge Excess Pavement

B

L

Bicycle Lane Bicycle Buffer

Driveway

Travel Lane

Tree Grates Sidewalk

BB BU

DBL EAS

Dedicated Bus Lane M/TL Median/ Turn Lane

S

X Y

P

SB

Building

Easement

Parking

Setback

Yard

W W Gateway entrance sample photo. Ybor City, Tampa. FL

99 | EAST SUNRISE IMPROVEMENTS MASTER PLAN

Made with FlippingBook - Online catalogs