FINAL East Sunrise Improvements Master Plan_3.21.19

C. GATEWAY ENTRANCES (CONTINUED)

STREET SECTION

R.O.W

NW 64 TH AVENUE BETWEEN SUNSET STRIP & OAKLAND PARK BOULEVARD

Description

01 02 03 04

Narrow lane widths

One lane in each direction

Designate bike lane and buffer (both sides)

New 6’-8’ sidewalk (both sides)

Short-Term Improvements

01

Provide traffic calming measures, such as, striped intersections, painted crosswalks, raised speed table, and bollards. (pedestrian safety) Increase tree canopy along sidewalk (pedestrian comfort; shade) Provide additional landscape at median (street aesthetics) Provide banners at existing street light post (community identity and branding) Provide wayfinding signage at major intersections (community identity and branding)

02 03 04

05

PLAN

LEGEND

AL

C D

G/T

PL TG

SF VV

Asphalt Removal & Landscape

Curb and GuƩer

Strip of Grass/ Shade Tree

Planters

Single-Family Home Vehicular Verge Excess Pavement

B

L

Bicycle Lane Bicycle Buffer

Driveway

Travel Lane

Tree Grates Sidewalk

BB BU

DBL EAS

Dedicated Bus Lane M/TL Median/ Turn Lane

S

X Y

P

SB

Building

Easement

Parking

Setback

Yard

100 | EAST SUNRISE IMPROVEMENTS MASTER PLAN

Made with FlippingBook - Online catalogs