F. COMMERCIAL CORRIDORS (CONTINUED)
UNIVERSITY DRIVE
R.O.W
STREET SECTION
Description
01 02 03 04 05
5’ sidewalk
Three lanes in each direction 21’-3” median with turn lane
Bicycle lane markings
Major arterial street lighting
Short and Mid-Term Improvements
01 02
Maintain existing curb
Narrow lane widths; restripe to allow more space for bicycle lanes and buffers
03 04 05 06
Designate bicycle lanes on both sides
Increase tree canopy along sidewalk (pedestrian comfort; shade) Provide additional landscape at median (street aesthetics) Provide “commercial” character banners at street light posts (community identity and branding) Provide wayfinding signage at major intersections (community identity and branding) Provide enhancements to bus stops; shelter structure, bench, bicycle storage (pedestrian comfort) Crosswalk enhancements at major intersections and mid-block crossings; paint day with the community (community identity and branding) Provide clearly defined pedestrian pathway connections to commercial buildings
07
08
09
PLAN
LEGEND
10
AL
C D
G/T
PL TG
SF VV
Asphalt Removal & Landscape
Curb and GuƩer
Strip of Grass/ Shade Tree
Planters
Single-Family Home Vehicular Verge Excess Pavement
B
L
Bicycle Lane Bicycle Buffer
Driveway
Travel Lane
Tree Grates Sidewalk
BB BU
DBL EAS
Dedicated Bus Lane M/TL Median/ Turn Lane
S
X Y
P
SB
Building
Easement
Parking
Setback
Yard
105 | EAST SUNRISE IMPROVEMENTS MASTER PLAN
Made with FlippingBook - Online catalogs