FINAL East Sunrise Improvements Master Plan_3.21.19

F. COMMERCIAL CORRIDORS (CONTINUED)

OAKLAND PARK BOULEVARD

R.O.W

STREET SECTION

Description

01 02 03 04

6’ outer sidewalk

Three lanes in each direction 31’-7” median with turn lane Major arterial street lighting

Short and Mid-Term Improvements

01 02

Maintain existing curb

Narrow lane widths; restripe to allow more space for bicycle lanes and bendable barrier buffers

03 04 05 06

Designate bicycle lanes on both sides

Increase tree canopy along sidewalk (pedestrian comfort; shade) Provide additional landscape at median (street aesthetics) Provide “commercial” character banners at street light posts (community identity and branding) Provide wayfinding signage at major intersections (community identity and branding) Provide enhancements to bus stops; shelter structure, bench, bicycle storage (pedestrian comfort) Crosswalk enhancements at major intersections and mid-block crossings; paint day with the community (community identity and branding)

07

08

PLAN

09

LEGEND

AL

C D

G/T

PL TG

SF VV

Asphalt Removal & Landscape

Curb and GuƩer

Strip of Grass/ Shade Tree

Planters

Single-Family Home Vehicular Verge Excess Pavement

B

L

Bicycle Lane Bicycle Buffer

Driveway

Travel Lane

Tree Grates Sidewalk

BB BU

DBL EAS

Dedicated Bus Lane M/TL Median/ Turn Lane

S

X Y

P

SB

Building

Easement

Parking

Setback

Yard

106 | EAST SUNRISE IMPROVEMENTS MASTER PLAN

Made with FlippingBook - Online catalogs