Mission 2024 Eclipse Competition Manual

MISSION 2024 ECLIPSE COMPETITION MANUAL

Section 10 Field Assembly, continued

To create the Field Perimeter, you will need fourteen (14) 10 ft long, 1 inch diameter, PVC pipes cut to the following lengths.

1” PVC Lengths (14 Total 10’)

14 @ 60 inch 2 @ 45 inch 8 @ 30 inch 6 @ 24 inch 13 @ 15 inch 10 @ 10 inch

x7 x2 x2 x2

x1

In addition, the following 1 inch PVC connectors are also required.

18 - 90 Degree Connectors

12 - Coupler Connectors

12 - T-Connectors

ROBOTICS EDUCATION & COMPETITION FOUNDATION - AERIAL DRONE COMPETITION 67

Made with FlippingBook HTML5