Building Industry Hawaii - July 2023

CONTRACTS AWARDED

Info contained in “Contracts Awarded” is summarized from updates published weekly in BidService Hawaii . Contact Research Coordinator Keoni Perkins at 808-738-4935, email info@bidservicedaily.com or scan the QR code to subscribe. May Contract Awards Rally as Low Bids Surge Hawaiʻi contractors took home $68,824,702 in May, a welcome 231 percent rise over April’s $20.7 million in awards. The Hawaii Department of $6,796,037 to Jas W. Glover Ltd. for resur- facing Kuhio Highway on Kauaʻi. May’s third-largest award was with $6,070,423. While May’s $68.8 million in awards is encouraging, it still lags behind the $100 million to $200 million state agencies typically award each month statewide. But local contractors can take heart

from the City & County of Honolulu for $6,384,000, which went to Frank V. Coluccio Construction Company Inc. for rehabilitation of a 45-inch force main at Beach Walk in Waikīkī. By island, Oʻahu led the month with $50,511,742 in awards, followed by Kauaʻi with $8,154,685 and Hawaiʻi island

Transportation led state agencies with $44,575,872 in May contracts along with the month’s top two awards — $32,900,209 to Goodfellow Bros. LLC for expanding and modifying freeway access at the Kapolei Interchange; and

— May’s Low Bids are a reliable guide to the value of upcoming projects. Many of these bids are substantial, with this month’s tally exceeding $880 million in total.

115 YEARS AND COUNTING

Oahu (808) 832-9245 • Maui (808) 877-5068 2344 Pahounui Drive • Hon, HI 96819 www.hcdhawaii.com

O‘ahu Goodfellow Bros. LLC...............................$32,900,209 Addition and modification of freeway access, Phase 3 — Kapolei Interchange Complex, Interstate Route H-1 Frank V. Coluccio Construction Company Inc.................................................$6,384,000 42-inch force main rehabilitation — Beachwalk Peterson Bros. Construction Inc...............$6,050,701 Track and field improvements — Waianae High School (Includes change order: $83,800) Integrated Construction Inc...........................$917,700 Drainage improvements — Kokokahi Place Gundaker Works LLC.....................................$797,216 Hatchery building improvements — Anuenue Fisheries Research Center (Includes change order: -$2.87) Sea Engineering Inc........................................$545,545 Trench drain repairs — Kalaeloa Barbers Point Harbor Paul's Electrical Contracting LLC.................$429,700 Fuel storage tank replacement, Honolulu Fire Department — Nanakuli Fire Station Hoku Pacific Inc..............................................$265,500 Repair harbor agent's office — Kalaeloa Barbers Point Harbor C C Engineering & Construction Inc............$251,800 Savanna trellis rehab-penguin — Honolulu Zoo HSI Mechanical Inc..........................................$168,596 APC replacement, BS-108 — Leeward Community College

Island Landscaping & Maintenance Inc.......$149,758 Maintenance of landscaped areas and maintenance and inspection of irrigation system — Halekou Interchange to Kailua Interchange, H-3 Freeway Road Builders Corp........................................$143,814 Playcourt resurface — Daniel K. Inouye Elementary School (Includes change order: $13,500) Igloo AC LLC....................................................$133,022 Install split A/C units, Building O, DOE — Daniel K. Inouye Elementary School Ons Refrigeration LLC....................................$127,613 Install A/C units, various classrooms, DOE — Kahuku High and Intermediate School Mega Construction Inc...................................$126,675 Drain pipe repair/ replacement — Ulune Street Max Island Air Conditioning..........................$120,194 Install window A/C units, Buildings A, B and C — Puohala Elementary School Road Builders Corp.........................................$114,150 Maintenance yard repavement — Hawaii State Veterans Cemetery JRD Electrical & Construction Corp..............$110,000 Install A/C units, various buildings, Phase 2 — Leilehua High School LPN Landscaping & Tree Service LLC............$98,400 Maintenance and cutting — Fort Weaver Road

Hawaii Works Inc................................................$92,500 Entering end deck repair, westbound — Nimitz Highway Society Contracting LLC...................................$78,858 IT office improvements Alan Shintani Inc................................................$63,388 Comfort station repairs — Sand Island State Recreation Area Peterson Bros. Construction Inc.....................$56,997 Repair, paving and painting for access for works of art transpor- tation — Beretania Street parking lot Kaikor Construction Associates Inc................$54,100 Spall/delam repairs, southbound — Fort Weaver Road Cane Haul Bridge Akamai Roofing Inc...........................................$49,926 Installation of marquee sign — ‘Aiea Elementary School (Includes change order: $14,027) Glad's Landscaping & Tree Trimming Inc.......$47,912 Tree trimming and tree removal services — Aloha Stadium Island Pacific Distributors Inc..........................$43,450 Campus rekeying — Daniel K. Inouye Elementary School Paul's Electrical Contracting LLC....................$39,970 Vessel sewage pump-out replacement — Waiānae Small Boat Harbor Termite Express LLC.........................................$37,670 Fumigation treatment of campus buildings — Lāie Elementary School

102 | BUILDING INDUSTRY HAWAII | JULY 2023

Made with FlippingBook - Online Brochure Maker