Titan Times 2023

22 __

TITAN TIMES | 2023 YEAR IN REVIEW

PROJECT HIGHLIGHTS Manhole Makeover

A client in Fort Erie, Ontario, faced the challenge of rehabilitating a corroded and infiltrated concrete manhole chamber located across a river in an undisturbed rural setting. Conventional dig and replace methods were hindered by safety risks, environmental disruption, and high costs. Enter the PREDL Flexliner System , a trenchless and versatile solution. Collaborating with Link Utility Technologies, Titan executed the first installation in Canada within two days, minimizing disruption to the neighborhood. The PREDL Flexliner solution rapidly and effectively restored the manhole, leaving the customer satisfied. This success highlights the PREDL Flexliner as a cutting-edge, cost-effective solution for concrete sewer manhole rehabilitation, ensuring quick installation and overcoming challenges associated with traditional methods.

Storm Surge Solutions

As part of a large-scale stormwater infrastructure initiative in Southern Alberta, our team successfully installed a total of 1,031 stormwater chambers to boost the region's stormwater management capabilities. Simultaneously, we supplied and installed 69,965 ft² (6,500m²) of prefabricated 30mil LLDPE geomembrane, providing a robust barrier to prevent soil contamination from stormwater runoff. The project was completed sucessfully and enhanced local stormwater infrastructure in a sustainable fashion for long-term performance.

Made with FlippingBook - professional solution for displaying marketing and sales documents online