Southern Regional Assembly RSES LowRes

Location

Brief Description and Indicative Residential Yield: Yields are indicative only, will be revised in the context of compact growth targets, departmental guidelines and development plans. The redevelopment of the North and South Docklands and Tivoli is one of the most significant urban regeneration schemes in Ireland. It will require significant investment in supporting infrastructure to proceed. TheCityDocks, over 160ha, comprises the North and South Docks. Through Local Area Plan process, Cork City Council are seeking to regenerate the brownfield site as a sustainable, vibrant, mixed use socially inclusive quarter, an extension of the city centre, capitalising on its waterside setting, access to city centre and public transport networks. Strong urban design and place making principles are at the core of the regeneration initiative. The regeneration of the Cork City Docks provides significant opportunities for new enterprise and employment uses. Potential Yield: 9,500 residential units. 9,500 jobs based on 920,000 sq.m office space and additional jobs from services, retail, restaurants etc.

Infrastructure Priorities subject to required appraisal, planning and environmental assessment processes

Cork City Docks

As per Chapter 3 Objective on investment for holistic infrastructure for metropolitan areas.

Of particular note: •

The redevelopment of the docklands is strongly linked to the relocation of Port activities from the city and development of new Port of Cork facilities in Ringaskiddy, the construction of the M28 Cork to Ringaskiddy and facilities at Marino Point. Cork Docklands are key to unlocking the travel demand for the proposed Light Rail system and will greatly enhance the potential for high-density mixed-use development in Docklands.

For mobility: •

River crossings including Eastern Gateway Bridge and Mil l Road Bridge, upgrades to Monahan Road, Centre Park Road and bridge approach roads, PT provision, transition area junction upgrades/

• • • • • • •

Flood relief measures.

Marina Park, Kennedy park, quayside amenities. Horgan’s Road relocation. Cultural and tourism infra. Education and health infra. Potential Brownfield Site remediation. Cross-river watermain to serve South Docks.

Southern Regional Assembly | RSES

250

Made with FlippingBook flipbook maker