Construction Update
Structural steel getting primed and painted.
Getting ready to pave the north side of the Clubhouse.
Acoustical panels being installed at the Fitness Center.
Millwork being installed on the ceilings.
Kitchen floor being prepped for mortar.
Interioir fencing installed on the courts.
Shade steel structures are up at the Courts Pavilion.
Construction Update
Kitchen floor being prepped for mortar.
Applying mortar to Kitchen floor.
Sliding glass doors installed in the main dining room.
Ready to hang TVs above the Terrace Bar.
Steel structures added to the Event Room patio .
Steel shade structures have been installed at the Courts.
Internal fence installations at the Courts complex.
Construction Update
Continuing work on the porte cochere.
View of tunnel and Clubhouse Event Room.
Brick work near the entrance at the North side of the clubhouse.
East view of the Clubhouse.
North entrance of the clubhouse. Working on landscaping planter conduits
Painting almost completed on the exterior.
Installing sidewalk frames.
Construction Update
North side of the clubhouse.
Window frames being installed.
Ceiling drywall installation in the main dining room.
Retaining walls going up around the courts.
Curbwork in the parking area being set.
Construction Update
Concrete pathways removed.
Scaffolding being installed at the Porte Cochere.
Porte Cochere is ready for roofing.
Courts Pavilion framing complete.
North side of the Events Room.
Construction Update Tennis Courts Concrete Pour
Early start to begin concrete pour of the two tennis courts.
Pouring cement for first tennis court.
Texturizing the finish on the first tennis court.
Applying finishing touches to the concrete.
Moving to the concrete pour of second tennis court.
Texturizing the second tennis court. Next up, on to the pickleball courts!
Construction Update
Welding in progress on exterior steel
East side progress
Footing being prepared for the lower level bar at The Grill
Drywall installed in the Pro Shop
Drywall installed at the lower level hallway
Bar at main dining room being framed
Light fixtures being installed in the main dining room
Entry way framing at the Clubhouse
Courts pavilion roof and concrete floor pad
Courts Pavilion concrete slab poured
Courts Pavilion roof structure in progress
Construction Update
Prepping for the concrete pour at the Courts Pavilion
Concrete forms being installed for the Courts Pavilion
Courts Pavilion structure going up
Plaster on the exterior walls of the Clubhouse
HVAC duct work in the main dining room
Construction Update
Roofing progress
Mechanical well being prepared for stucco.
Front entrance ramp progress.
Framing on the porte cochere in progress.
HVAC duct work and electrical conduits being installed throughout the building.
Steel columns installed at pavilion building.
Courts footings ready for the concrete pour.
Courts pavilion footings poured.
Construction Update
Trenching Court Foundations
Courts trenching for retaining walls.
Duct work being installed throughout the clubhouse.
Scaffolding in place. Yellow Dens glass will soon be covered with lath and plaster.
Drywall sheets have been loaded in and installation has begun.
Roofing insulation being installed.
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54 Page 55 Page 56 Page 57 Page 58 Page 59 Page 60 Page 61 Page 62 Page 63 Page 64 Page 65 Page 66 Page 67 Page 68 Page 69 Page 70 Page 71 Page 72 Page 73 Page 74 Page 75 Page 76 Page 77 Page 78Made with FlippingBook - Online Brochure Maker