Cameroon exploration progresses with Multotec pilot plant
An exploration project in a remote area of Cameroon has been using a modular pilot plant from Multotec – complete with screen panels, cyclone and spiral – to conduct small-scale testing on its site.
optimal size range of between 38 μm and 1.0 mm. This is fed into the spiral rig for concentra- tion, with the spiral delivering a concentrate, middlings and tailings. The process allows the project to assess its economic heavy minerals (EHM) portion, which is concentrated towards the inner section of the spiral. “Multotec’s HX5 and 117HM spirals were employed to suit the customer’s requirement, with the new 117HM spiral showing excellent recovery in mineral sands,” says Bornman. “With the HX5 handling up to 5.5 tph and the 117HM 2.3 tph, these spirals also offer differ- ent recoveries and grade in the various heavy
minerals.” The equipment in this pilot plant is vital to achieving an accurate assessment of the deposit’s viability, but the results also give the customer important insights into how the full-scale plant should be designed if explora- tion provides positive results. “To ensure that the customer receives optimal value from the pilot plant, we sent a process engineer to site to commission the system,” he says. “During the several weeks that he spent there, he also conducted training with local staff on how to run and maintain the plant,” Bornman concludes. www.multotec.com
E xploring for heavy minerals in Camer- oon, a multinational mining company is gaining valuable results and insights through the use of an on-site pilot plant from South Africa-based process equip- ment leader Multotec. The pilot plant was designed and as- sembled at Multotec’s extensive design, manu- facturing and testing facilities at Spartan near Johannesburg, and shipped to the remote site in central Africa last year. The containerised plant comprises a range of Multotec’s own equipment including screen panels, cyclone rig and spiral rig. According to Faan Bornman, technology manager for research and development at Multotec’s technology division, drill samples from the prospect area are passed over the screen to remove oversized material, with undersize going into a sump to be mixed with water to the correct density. The undersize material reports to the cy- clone for desliming – the removal of very fine particles – delivering an underflow with an Faan Bornman, technology manager for research and development at Multotec.
A heavy minerals exploration project is using a Multotec modular pilot plant at a remote site in Cameroon.
The containerised pilot plant incorporates Multotec equipment including screen panels, a cyclone rig and a spiral rig designed.
22 ¦ MechChem Africa • July-August 2022
Made with FlippingBook flipbook maker