Construction World August 2025

˜

    ”’ ƒŒ

     „ ‚      †  Š ƒ« “   ‘™ •›  •š

               €       ‹³   µ„ € €           „       € € „  „           ³ ¤ €                          €       €€  €   €                    ƒ  Š     ‹                €    € ƒ‰              „ ƒ       ‰ €‹   

Early project works undertaken by Concor include establishing access roads, site offices and an on-site batching plant, in preparation for the large volumes of concrete needed for the turbine foundations.

        – †       ‹ — ¦  €         € ‹        € „  Š         € †   ƒ‰            „ ª  ‹      € †   †       „ ¦   €    „       € š  ‹        ‹                  ‹„                ‹      €        „                        ‰        ‹    €  €     €        ƒ Ž                  ‹         “‰ “ˆ        €     ‹ †         µ      €€    „      €   €  ‹³ š  µ¦   ‹                € „              —Š„    „              „   ³    €  ‹       Š   „     „           €€    € ‹     „          €   §  „       €€  „  “                      ‹  €    €     ƒ‰     €         ‹            €                 µ     € „           

 ‡ Ž   €      € †         ƒ‰ Ž    ƒƒ        µ     €        „            ˆ   ‹³  € µ–    €    €   ‹   „       „     „ ³         €         „  ‹             € „      €          €             ‹  ‹‰             „               „       €             „           Š            €      „       „   µ  €           ƒ ‹              ‹³  µ  €     €    ‹    ‹                     ³ 

A close-up view captures the excavation of a wind turbine base underway at Karreebosch Wind Farm, where Concor is preparing the foundation to exact specifications based on detailed geotechnical investigations.

£   

Made with FlippingBook flipbook maker