HILTON KILMAINHAM
Programme: 25 weeks Client: Thornmont Limited Project Manager: Consarc Architect: Consarc Cost Consultant: Consarc M&E: Caldwell Consulting
The Hilton Hotel Kilmainham, a 4 star Hilton Hotel overlooking the Kilmainham Gaol Museum, was in need of additional bedrooms therefore Hilton decided to convert some of their meeting space and offices into bedrooms, making the Hotel into a 130 bedroom offering. Ardmac were appointed to refurbish & reconfigure the existing meeting rooms, back of house and reception to provide 10 additional bedrooms which included 1 accessible bedroom. The works also involved the relocation of comms room, luggage store and reconfiguration of back of house office at ground floor level along with the reconfiguration of 1 no existing meeting into two offices at basement level. The main reception area was reduced in area with work involving the relocation of the reception desk area, construction of the new luggage store and comms room along with back of house office, works to the existing level ramp including new balustrade and a refresh to all existing finishes. The Hotel remained operational throughout the works; therefore, phasing was required to ensure continuity was maintained for the Hotel.
10
Made with FlippingBook - professional solution for displaying marketing and sales documents online