Casco City of San Diego EV Charging Stations

1.8 Opportunities and options for additional funding necessary for site upgrades and code requirements (ADA, CalGreen). o Every site is unique and navigating the various code requirements for site upgrades can be confusing. Casco Design Studio’s team are experts in ADA code compliance and can advise on the best way to meet code while also keeping additional costs down. 1.9 Service-level agreement terms regarding performance, payments, utilization data, maintenance, repairs, etc. o Most service level agreements are 1-2 years in length and includes warranty and maintenance. Extended warranty and maintenance are available either through the EV manufacturers or third parties. o Casco Contractors can provide a service-level agreement after the manufacturer’s warranty expires. 1.10 Options for oversight, approval, or control of charging rates by the City and method of coordination with EVSE provider. o Most service level agreements are 1-2 years in length and includes warranty and maintenance. Extended warranty and maintenance are available either through the EV manufacturers or third parties. o Casco Contractors can provide a service-level agreement after the manufacturer’s warranty expires. 1.11 Preferred information to be included in an RFP in order to successfully develop a comprehensive proposal. o Detailed list of scope of services. o Include minimum insurance requirements. o Advise if any or all portion of the work must be prevailing wage.

casco D E S I G N S T U D I O

CascoContractors.com CascoContractors.com CascoDesignStudio.com 9850 Irvine Center Drive, Irvine, California 92618

4660 La Jolla Village Drive, Ste. 100, San Diego, CA 92122

Made with FlippingBook Learn more on our blog