INSTALLATION GUIDE
INSTALLATION DESIGN-UNITS
MINI HIGHWAY
Linear drainage unit
3-6 mm
600 mm nominal
Footway level
Footway level
Mini highway top unit
Carriage level
Wearing Course Base Course
Wearing Course Base Course
Carriage level
Cementitious road base
Bitumous road base
150 min 150 min
Sub base
Allowance made for expansion of cementitious roadbase or reinforcement of concrete surround
Sub base
Cover plate
ST4 concrete bed and haunch. Haunch to extend to half unit height.
Mini highway base unit
Mini highway base unit
25mm class 1 mortar mix 1:3
100
Linear drainage unit
600 mm nominal 10
100
3-6 mm
100
Linear drainage unit
Wearing Course Base Course
Wearing Course Base Course
100
100
Concrete base and haunch
ST4 concrete
3-6 mm
600 mm nominal
600 mm nominal
Cementitious road base
Bitumous road base
ST4 concrete
Concrete base and haunch
150 min 150 min
RC slab
150 min
Allowance made for expansion of cementitious roadbase or reinforcement of concrete surround
Fig 7. Mini Highway standard installation
Fig 8. Mini Highway crossing detail
ST4 concrete bed and haunch. Haunch to extend to half unit height.
expansion joint as opposite
25mm thick highly compressible joint filler topped with 25x25mm polysulphide or similar mastic sealant
150 min
25mm class 1 mortar mix 1:3
25mm class 1 mortar mix 1:3
CLEARWAY/SAFETICURB ®
Linear drainage unit
Linear drainage unit
Stretcher course of CBP on mortar or 50mm of granolithic concrete
3-6 mm
3-6 mm
600 mm nominal
Linear drainage unit
600 mm nominal
600 mm nominal
Wearing Course Base Course
Wearing Course Base Course
Charcon Europa Block Paving
3-6 mm
PC Kerb as edge restraint
RC slab
150 min
Cementitious road base
Bitumous road base
150 min 150 min
Sand bed
expansion joint as opposite
25mm thick highly compressible joint filler topped with 25x25mm polysulphide or similar mastic sealant
100
100
150 min
Allowance made for expansion of cementitious roadbase or reinforcement of concrete surround
25mm class 1 mortar mix 1:3
ST4 concrete bed and haunch. Haunch to extend to half unit height.
150 min
25mm class 1 mortar mix 1:3
25mm class 1 mortar mix 1:3
ST4 concrete bed and haunch
25mm class 1 mortar mix 1:3
Stretcher course of CBP on mortar or 50mm of granolithic concrete
3-6 mm Fig 11. Basic unit – flexible/semi-flexible installation Linear drainage unit
Linear drainage unit Fig 12. Basic unit – rigid installati n
Fig 13. Basic unit – block paved installation
Charcon Europa Block Paving
3-6 mm
PC Kerb as edge restraint
600 mm nominal
600 mm nominal
Extent of additional haunching required to ensure lateral stability on minor roads with minimal depth of carriageway construction
Sand bed
RC slab
150 min
100
100
25mm class 1 mortar mix 1:3
150 min
expansion joint as opposite
25mm thick highly compressible joint filler topped with 25x25mm polysulphide or similar mastic sealant
150 min
25mm class 1 mortar mix 1:3
Footway or verge
ST4 concrete bed and haunch
25mm class 1 mortar mix 1:3
100 mm max
Stretcher course of CBP on mortar or 50mm of granolithic concrete
Linear drainage unit
Charcon Europa Block Paving
3-6 mm
PC Kerb as edge restraint
Extent of additional haunching required to ensure lateral stability on minor roads with minimal depth of carriageway construction
Sand bed
100
100
25mm class 1 mortar mix 1:3
Footway or verge
Concrete base & haunch
150 min
25mm class 1 mortar mix 1:3
100 mm max
ST4 concrete bed and haunch
125 min
460
148
TECHNICAL INFORMATION: charcon.technical@aggregate.com
Extent of additional haunching required to ensure lateral stability on minor roads with minimal
Concrete base & haunch