[RFE COPY] EB2678 ISA Audit Preparation Gap Analysis_Globe

Observations:

Facility Cleanliness:

EHS Program:

The facility is exceptionally clean, with commendable housekeeping practices. This cleanliness contributes to a safer and more efficient working environment by minimizing hazards and ensuring that all areas are organized and free of clutter. The attention to housekeeping details reflects the company's commitment to maintaining high operational standards and fostering a culture of excellence.

The EHS program is well-maintained, with no violations of safety or environmental regulations found. This demonstrates a strong commitment to health, safety, and environmental stewardship. The absence of violations ensures a safe workplace for employees and minimal environmental impact.

MT&E Usage:

A calibrated tool was found in use without a dust cover and had been modified by a quality inspector. This could lead to potential errors in test results, highlighting the need for strict adherence to tool maintenance and modification protocols. The use of modified tools greatly increases the risk of inaccuracies, which can compromise the integrity of all parts tested in this manner. This raises the potential for nonconforming parts, impacting product consistency, reliability, and ultimately, customer satisfaction.

Production Controls:

Production controls are highly effective and consistently in place, enabling the seamless execution of manufacturing processes. These controls include detailed process documentation, real-time monitoring systems, and regular audits to ensure compliance. The robustness of these production controls minimizes downtime, reduces errors, and enhances overall productivity, thereby contributing to the company's ability to meet customer demands reliably.

Gemba Walks:

The VP of Engineering actively engages in Gemba Walks with the team periodically, a practice that has led to the implementation of best practices across the production floor. These walks involve direct observation of work processes, allowing for immediate identification and resolution of issues. The hands-on approach of the VP of Engineering fosters a culture of continuous improvement and accountability, with team members regularly updating and optimizing procedures based on real-time feedback and observations.

3

Made with FlippingBook - Share PDF online