Building Germfree in Europe and the UK

CASE STUDY Modular Biopharmaceutical Cleanroom/Production Facility A large National Public Health Organization had an urgent need for a new Tumor Infiltrating Lymphocytes (TIL) production facility to serve the organization’s surgery branch.

The scope included a large mezzanine space which made the facility self-sustaining and turnkey. The facility connected to campus utilities.

This facility is for the relocation of the manufacturing programme, which complies with the latest FDA-GMP requirements and regulations. Germfree’s bioGO® Modular Solution involves approximately 558m² (Gross) of manufacturing suites, lab, office, QA/QC, storage, and supporting area, all constructed within ten (10) Factory Acceptance Tested (FAT) modules. Modules are completely built offsite, tested, then delivered and installed. The “Turnkey” system from Germfree includes necessary mechanical and electrical equipment, including AHU/s and chillers to support operations.

Other project details: 10 prefabricated modules, Bidirectional layout, Single pass air, Segregation, >604m² mezzanine space.

13

Made with FlippingBook - professional solution for displaying marketing and sales documents online