INSTALLATION EXAMPLES
REPLACEMENT OF CLASSIC STUFFING BOX
Classic Stuffing Box... Before
PSS Shaft Seal... After
Stern Tube (Shaft Log)
Stern Tube (Shaft Log)
Compressed Length
Stuffing Box
Shaft
Shaft
Hull
Transmission Hull
Transmission
Rubber Hose
EXAMPLE OF POWERBOAT INSTALLATION
Water Pickup Line
Vented Loop
Water Pickup Line
Crossover Line
SAILBOAT INSTALLATION
POWERBOAT INSTALLATION
Heat Exchanger Riser
Vent line (Above water line)
Oil Cooler
Water Pump
REMINDER
1. Tee into line after heat exchanger. 2. Tee into line after oil cooler. 3. Tee into line after water pump. 4. Hose barb into heat exchanger or oil cooler.
When the pick up point is located below the waterline an anti- siphon might be required to prevent back flooding of water through the exhaust system and into the engine. Standard boat plumbing practices should be followed.
TO ORDER VISIT WWW.PYIINC.COM OR CALL 425-355-3669
12
PSS SHAFT SEAL |
Made with FlippingBook HTML5