TECHNICAL SPECIFICATIONS
of portals 1 to 5 (Phase I and II). • Air conditioning (hot/cold air) by means of individual heat pump equipment and production of Sanitary Hot Water (ACS ) by individual Aerothermal equipment in the apartments of portals 6 and 7 (Phase III). • Air ducting distribution with supply and return grilles in bedrooms and living rooms. ELECTRICITY • Mains switchboard with provisions for additional circuits for whitegoods and climate controls. COMUNICATIONS • Video intercom for access to the complex and dwellings. • Telephone wiring in living room and bedrooms. Pre-installation for telecommunications services. • Communal TV aerial points in living room and bedrooms. Pre-installation for other services like cable TV or other digital platforms. PLUMBING • Hot/cold water outlet and drain for washing machine and dishwasher. • Shower with thermostatic taps and enclosure. • Sanitary appliances with single-handle mixing taps. • Mirrors in bathrooms and cloakroom. KITCHENS • Fitted kitchens with high and low cabinets, crystal effect. Opening Gola systems, under counter sink with single handle mixing taps. • Compact quartz countertops. • Electric ceramic hob and extractor fan. • Oven with microwave function.
COMMUNAL AREAS • Central area with two swimming pools, perimeter lagoon and relax areas. • Dedicated reception and access control building. • 2 Paddle tennis courts. • Gym. • Children’s play areas • Interior street with covered (natural fibres) parking spaces. VARIOUS • Domotics pre-installation. • Underground car park. • Pre-installation for electric vehicles charging points. • Storage rooms. • Jacuzzi in the penthouses. STRUCTURE • Formed by structure of pillars and reticular concrete slab. ROOF • Flat roof with maintenance access only. Double layer of waterproofing and thermal insulation. FACADE • Ceramic brick with thermal insulation and acrylic exterior finish, air chamber, interior thermal insulation and cladding with laminated double plasterboard partitions. EXTERIOR CARPENTRY • Aluminium exterior joinery with sliding, tilt and turn opening according to project. • Polyurethane injected aluminium roller shutters the same colour as joinery. • Motorized living room shutters. • Double glazing with solar control and vacuum argon chamber.
INTERIOR CARPENTRY • Security main entrance door with the same finish as the rest of the carpentry. • White lacquered interior doors with steel fittings. • Lined built-in wardrobes with shelves, hanging rails and drawers according to project. INTERIOR DISTRIBUTION • Separation between dwellings with soundproofing brick, metal profiling, insulation and laminated plasterboards. • Interior distribution with laminated double plasterboard partitions, internally insulated. INTERIOR FINISHES • FLOORS Porcelain stoneware tiles in living rooms, bedrooms and kitchens. Designer ceramic tiles in bathrooms and cloakroom. Ceramic floors in terraces and solariums. • CEILINGS False, plasterboard ceiling throughout the house with a smooth white paint finish. Decorative moulding ceilings in living rooms. False concrete plate ceiling in the terraces. Accessible false ceiling in bathrooms and/or WC for air conditioning and ventilation units. • WALLS Kitchens: Back wall between countertop and high units lining, with compact board and aluminium finish. Bathrooms and cloakroom with designer ceramic tiles. Rest of the rooms finished in smooth soft tones paint. AIR CONDITIONING, HEATING AND HOT WATER • Air conditioning (hot/cold air) and sanitary hot water by means of individual Aerothermal equipment in the apartments of
Private residential complex with central lagoon, incorporating garden areas, 2 swimming pools, 2 paddle tennis courts, gym and children’s play area.
Made with FlippingBook - professional solution for displaying marketing and sales documents online